Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
plan [2024/01/28 16:35] – epsatisep | plan [2024/06/21 12:39] (current) – epsatisep | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Milestones ====== | ====== Milestones ====== | ||
- | * 2024-02-26 Choose a project proposal and send your choice via email to epsatisep@gmail.com | + | * 2024-02-24 Choose a project proposal and send your choice via email to epsatisep@gmail.com |
- | * 2024-03-08 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning) | + | |
* 2024-03-06 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki | * 2024-03-06 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki | ||
+ | * 2024-03-08 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning) | ||
* 2024-03-13 Upload the **List of Components and Materials (what & quantity)** to the wiki | * 2024-03-13 Upload the **List of Components and Materials (what & quantity)** to the wiki | ||
* 2024-03-20 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure | * 2024-03-20 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure | ||
Line 18: | Line 18: | ||
- Update the wiki, report, paper with all suggested corrections | - Update the wiki, report, paper with all suggested corrections | ||
- Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | - Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | ||
- | - Hand in to the EPS coordinator a **printed copy of the refined report and poster** | + | - Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** |
* 2024-06-27: | * 2024-06-27: | ||
- Hand in the **prototype and user manual** to the client | - Hand in the **prototype and user manual** to the client |